Boat of the historic Spertini shipyard, built in triple crossed planking - In 2005 replacement of engines with new 1530hp MTU - In 2009 important refitting of the interiors and exteriors with renovation of the galley, cabins, upholstery, floor, hull brought to zero - Very well exploited internally with 4 cabins and 4 bathrooms, each with bidet, and sailor's cabin in the bow for three - Electronics 2009 and electronic throttles Dinghy hauling crane on the fly Novurania dinghy Evinrude 40 horsepower engine length 3.60 meters. 2 16kw generator sets.