Boat completely overhauled and redone. Work in progress 2025/2026: Engine unloading and complete engine room refurbishment, replacement of the generator with a newer one and new air conditioning. Works 2024: Complete dismantling of all interiors, engine room and electrical system; Installation of a new electrical system; Construction of new furnishings on air naval design project; Installation of new furniture, kitchen, dinette and 3 bedrooms; Installation of new lighting on air naval design project; Installation of new 1.2cm WPC flooring; Fusion system with 2 amplifiers of 1200w, apollo ra770 + 6 speakers and 2 subwoofers, suitably isolated and soundproofed; Construction of a new bridge with home automation system and total control of the boat including engines on Garmin touch (1x gpsmap8416 + 2 x gpsmap8409); Complete overhaul of the arneson and wheelhouse carried out by an authorized workshop; Engine landing and total overhaul of the same with replacement of 24 heads, rings, bushings, etc., x total invoice of 70,000 euros, 2-year warranty; Installation of a new 40l boiler; Total hull and superstructure painting; New teak deck on all rooms for a total of 60m2; Overhaul of the besenzoni 3-extension gangway from an authorized workshop; Complete upholstery interior and exterior new; New sea intakes; Installation of LiFePO4 batteries, motors and service batteries, 5-year warranty; Emergency battery installation for motors and services; Isotherm ice machine; New grill; TV and soundbar in every room